Tolling Systems

< Back to Projects

Owner: Operated by CS France for Translink/Transcore
Project Timeline: 6 years
Project Scope: Installation, Maintenance, Modifications and Repairs.

Project Description: Installation, Troubleshooting and Maintenance of High-Speed Tolling in the Lower Mainland at Golden Ears Bridge and Port Mann Bridge. This includes vehicle classification systems (both Laser and Loop detection), analog and digital/IP video systems, RF detection systems, on site security system, communication systems (wired and fiber optic), maintaining equipment to meet expected KPIs. MTS was the sole provider of these services for both tolling systems in the Lower Mainland. We have extensive knowledge of these systems and their requirements.